Gueevin 2 Sheets Paris Tower Stickers Eiffel Tower Sticker Decal for Bedroom Living Room Sofa Backdrop TV Wall Romance Decoration
Package includes: you will receive 2 sheets of Eiffel tower wall stickers measuring 11.2 x 35.4 inch, each sheet including 1 piece of Eiffel tower sticker, the letters of Paris and some butterflies and hearts, which provide sufficient quantity for you to decorate different rooms
Romantic design: the removable Paris tower wall decals can exactly add the relaxing and warm atmosphere with the romantic elements to your home without painting or damaging your walls, which can be removed easily and would not leave adhesive residue
Reliable material: the stick and peel romance wall decals are made of vinyl material for serving you for a long time, which are easy to stick on the surfaces by peeling off the adhesive film and pasting on any smooth surface you like
Description
Features: Distinctive decorations: The romantic tower wall decals can be pasted anywhere you like to decorate your home. Combined with romantic Paris elements and smooth letter fonts, they would nicely become the interesting and eye catching decorations for your family. Fun of DIY: You can spend leisure time with your family to decorate your room with these Paris tower wall stickers, which are simple but diverting to DIY together, giving full play to your imagination and creativity to arrange and combine the romantic elements. Specifications: Material: vinyl Color: as shown in the pictures Size: 11.2 x 35.4 inch Package includes: 2 Sheets of Paris tower wall stickers Notes: Manual measurement, please allow slight errors in size. The size of the finished product would differ from your sticking ways. The color may exist a slight difference due to different screen displays. They may have some odor after production, please open them in a ventilated place to air for a few hours, and the smell will dissipate.
Package includes: you will receive 2 sheets of Eiffel tower wall stickers measuring 11.2 x 35.4 inch, each sheet including 1 piece of Eiffel tower sticker, the letters of Paris and some butterflies and hearts, which provide sufficient quantity for you to decorate different rooms
Romantic design: the removable Paris tower wall decals can exactly add the relaxing and warm atmosphere with the romantic elements to your home without painting or damaging your walls, which can be removed easily and would not leave adhesive residue
Reliable material: the stick and peel romance wall decals are made of vinyl material for serving you for a long time, which are easy to stick on the surfaces by peeling off the adhesive film and pasting on any smooth surface you like
Various applications: the Eiffel tower wall decors can be applied to wall decorations and photo props, suitable for smooth, flat, dry and clean surfaces like windows, doors, painted walls, tiles, etc.; You can use them to decorate the living rooms, bedrooms, kitchens, TV walls and sofa background
Note: the tower letters vinyl wall stickers may have some smell after production, please open them in a ventilated place to air for a few hours, and the smell will dissipate; After that, you could apply the wall decals in your house confidently
Additional information
| Brand |
|---|










![DORESshop LED Night Light, Night Lights Plug Into Wall [2 Pack] with Dusk-to-Dawn Sensor, Dimmable Nightlights, Adjustable Brightness for Bathroom, Hallway, Bedroom,Kids Room,Stairway,Soft White](https://m.media-amazon.com/images/I/31GupTSmkBL._SS265_.jpg)

Reviews
There are no reviews yet.